The Deck Professor

Home / Glossary

Deck glossary

66 terms. Each one opens into a drawing you can change.

100 mm (3 15/16 in) sphere

The test ball for guards: no opening may let a 100 mm (3 15/16 in) sphere pass.

100 mm (3 15/16 in) sphere drawing. The sphere passes under the bottom rail. Test sphere: 100 mm (3 15/16 in) across. Gap between pickets: 3 1/2 in. Gap under the bottom rail: 5 in.

Trade slang calls it the four inch sphere, but a gap of exactly 4 in is wider than the sphere and fails. The usual working gap for wood is 3 7/8 in clear.

Show me on a deck: The 100 mm (3 15/16 in) sphere test

Lessons: Gaps under rails and beside stairs

Answers: How far apart can spindles be, and what is the no climb rule?

Related terms: Baluster, Guard, Climbable

Read more: Uncovered Deck Design Guide, page 14 (City of Edmonton, PDF), Uncovered Deck Final Building Inspection checklist (City of Edmonton, PDF), National Building Code of Canada 2020 (National Research Council, the model code)

Above ground

Also called above ground use category.

The treatment level for wood that stays off the soil and can dry out between rains.

Above ground drawing. Above ground treatment. Touches the soil: no. Use category: above ground. Closer than 6 in to the ground: no.

Show me on a deck: Which wood goes where

Answers: Which parts of a deck have to be treated or naturally decay resistant?

Related terms: Ground contact, Heartwood, Incised

Read more: DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 3 (American Wood Council, a US code guide not in force in Canada, PDF), Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 27 (BC Housing, PDF), Uncovered Deck Design Guide, page 8 (City of Edmonton, PDF)

Authority having jurisdiction

Also called AHJ, or building authority.

The office that enforces the building code where you build and has the final word on your deck.

Authority having jurisdiction drawing. When a permit is needed: set by City of Edmonton. When a permit is needed: a building permit over 600 mm (23 9/16 in) high. Set by: City of Edmonton. Enforced by: the City of Edmonton, your authority having jurisdiction.

In Edmonton that is the City. It applies the Alberta Edition of the National Building Code and sets its own permit triggers.

Show me on a deck: Which permit this deck needs

Lessons: When an engineer must stamp it

Answers: Do I need a permit to build a deck?

Related terms: Development permit, Prescriptive, Engineer stamp, CCMC evaluation report

Read more: Building codes and standards (Government of Alberta), Deck (Uncovered) permits (City of Edmonton), National Building Code, 2023 Alberta Edition (National Research Council, the Alberta code), Codes Canada (National Research Council)

Baluster

Also called spindle, or picket.

One of the upright pieces that fill a guard; the gaps between them must stop a 100 mm (3 15/16 in) sphere.

Baluster drawing. The sphere passes between the pickets. Gap between pickets: 4 1/4 in. Test sphere: 100 mm (3 15/16 in) across. Guard: required above 600 mm (23 9/16 in).

Show me on a deck: The 100 mm (3 15/16 in) sphere test

Lessons: A guard on a low deck, Quantities from the shape

Answers: How far apart can spindles be, and what is the no climb rule?

Related terms: 100 mm (3 15/16 in) sphere, Guard, Climbable

Read more: Uncovered Deck Design Guide, page 14 (City of Edmonton, PDF), Uncovered Deck Final Building Inspection checklist (City of Edmonton, PDF), Inspecting a Deck, Illustrated (InterNACHI, inspection practice)

Beam

The horizontal member that carries the joists and bears on top of at least two posts.

Beam drawing. Beam: 2 ply of 2 by 6. Span used to pick the beam: 12 ft. Beam: 2 ply of 2 by 6. May be built as: no substitute listed. Post spacing: 6 ft.

The joist span it carries, plus any cantilever, and the spacing of its posts pick its size. Never bolted only to the side of a post.

Show me on a deck: Span plus cantilever picks the beam

Lessons: 4x4 or 6x6 post, Post spacing against beam size, Single span or two span beam, Beam overhang past the post, The beam sits on the post, Building up a beam, Two levels, one deck, Inspect from the ground up

Answers: What size beam and post does my deck need?

Related terms: Ply, Post, Drop beam, Flush beam, Cantilever

Read more: Prescriptive Residential Exterior Wood Deck Span Guide, page 10 (Canadian Wood Council, PDF), Prescriptive Residential Exterior Wood Deck Span Guide, page 5 (Canadian Wood Council, PDF), Uncovered Deck Design Guide, page 9 (City of Edmonton, PDF)

Blocking

Short pieces fitted between joists to stiffen the frame and back butt joints, border mitres and guard posts.

Blocking drawing. Board ends with nothing under them. Blocking: missing. Joists: 12, 16 in apart.

Show me on a deck: What blocking is for

Lessons: Blocking under a picture frame, Where board ends meet, Guard posts carry the push

Answers: How high does a deck railing have to be, and when do I need one?

Related terms: Joist, Picture frame border, Guard post, Rim board, Herringbone

Read more: Uncovered Deck Design Guide, page 14 (City of Edmonton, PDF), Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 16 (BC Housing, PDF)

Cantilever

Also called overhang.

The part of a joist that runs past the beam, or of a beam past its last post.

Cantilever drawing. Cantilever too long. Cantilever: 24 in. Allowed on a 2 by 8: 16 in. Span used to pick the beam: 10 ft.

Joists may overhang 8 in on a 2x4, 16 in on a 2x6 or 2x8, and 24 in on a 2x10 or 2x12, measured from the centre of the beam. Look up the beam with the span plus the cantilever.

Show me on a deck: How far joists may overhang

Lessons: Span plus cantilever picks the beam, When a cantilever is better, Beam overhang past the post

Answers: What size beam and post does my deck need?

Related terms: Drop beam, Joist, Beam, Span, Fascia

Read more: Prescriptive Residential Exterior Wood Deck Span Guide, page 5 (Canadian Wood Council, PDF), Prescriptive Residential Exterior Wood Deck Span Guide, page 7 (Canadian Wood Council, PDF), Uncovered Deck Design Guide, page 11 (City of Edmonton, PDF), Uncovered Deck Final Building Inspection checklist (City of Edmonton, PDF)

CCMC evaluation report

A Canadian Construction Materials Centre report on a product's uses and limits, for products the prescriptive tables do not cover.

CCMC evaluation report drawing. Needs its own proof. Covered by the prescriptive tables: no. Submit with the permit: a CCMC evaluation report, a test report, or Alberta engineer stamped drawings. Build to: the report and the maker's instructions.

Show me on a deck: Composite follows its own report

Lessons: Glass, cable and aluminum guards

Answers: What decking can I use and how far apart do the joists go?

Related terms: Composite decking, Prescriptive, Guard, Authority having jurisdiction

Read more: About the CCMC Registry of Product Assessments (National Research Council), CCMC Registry of Product Assessments (National Research Council, searchable list), Uncovered Deck Design Guide, page 12 (City of Edmonton, PDF), Uncovered Deck Design Guide, page 15 (City of Edmonton, PDF)

Climbable

A guard with rails or footholds a child can climb. Above 4.2 m (13 ft 9 5/16 in), nothing between 140 mm (5 9/16 in) and 900 mm (35 7/16 in) above the deck may be climbable.

Climbable drawing. A ladder for a child. Climbable rails: not allowed between 140 mm (5 9/16 in) and 900 mm (35 7/16 in) above the deck at this height. Deck height: 16 ft. Guard: required above 600 mm (23 9/16 in).

Show me on a deck: Nothing to climb above 4.2 m (13 ft 9 5/16 in)

Answers: How far apart can spindles be, and what is the no climb rule?

Related terms: Guard, Baluster, 100 mm (3 15/16 in) sphere

Read more: Uncovered Deck Design Guide, page 14 (City of Edmonton, PDF), National Building Code of Canada 2020 (National Research Council, the model code), National Building Code, 2023 Alberta Edition (National Research Council, the Alberta code)

Composite decking

Boards of wood fibre and plastic, or PVC, that follow their own evaluation report for joist spacing.

Composite decking drawing. The report sets the spacing. Each board spans: 24 in. Allowed for composite boards: whatever its evaluation report says. Joists: 9, 24 in apart.

Show me on a deck: Composite follows its own report

Answers: What decking can I use and how far apart do the joists go?

Related terms: CCMC evaluation report, Joist, Picture frame border

Read more: Uncovered Deck Design Guide, page 12 (City of Edmonton, PDF), About the CCMC Registry of Product Assessments (National Research Council), Uncovered Deck Final Building Inspection checklist (City of Edmonton, PDF)

Corrosion resistant fastener

A screw, nail, bolt or hanger rated for treated wood, usually hot dipped galvanized or stainless steel.

Corrosion resistant fastener drawing. A coating the treatment eats. Coating: plain zinc plated. Time outdoors: much later, not to a timescale. Rust: heavy.

Show me on a deck: Fasteners that match the treatment

Lessons: Metals that corrode each other, Screws, clips and nails, Rust where metal meets treatment

Answers: Which parts of a deck have to be treated or naturally decay resistant?

Related terms: Galvanic corrosion, Joist hanger, Lag screw

Read more: Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 28 (BC Housing, PDF), DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 2 (American Wood Council, a US code guide not in force in Canada, PDF), Uncovered Deck Design Guide, page 2 (City of Edmonton, PDF)

Deck height

The biggest drop from the deck surface to the lowest ground beside it, measured at the worst corner.

Deck height drawing. Low at the door, over the line at the far corner. Height at the door: 18 in. Height at the far corner: 29 1/2 in. Deck height, measured at the worst point: 29 1/2 in. Guard: required, over 600 mm (23 9/16 in). Building permit in Edmonton: required, over 600 mm (23 9/16 in).

It decides the guard, the permit and the engineer.

Show me on a deck: Measure height at the worst corner

Lessons: Which permit this deck needs, When an engineer must stamp it, When a deck counts as lot coverage, When a guard is required, What counts as the ground

Answers: How high can a deck go before it needs an engineer?

Related terms: Guard, Development permit, Site coverage, Engineer stamp

Read more: Uncovered Deck Design Guide, page 3 (City of Edmonton, PDF), Uncovered Deck Design Guide, page 5 (City of Edmonton, PDF), Uncovered Deck Design Guide, page 14 (City of Edmonton, PDF)

Development permit

Zoning approval for where a structure sits on your lot, separate from the building permit about how it is built.

Development permit drawing. Development permit needed. Development permit: required. Building permit: not triggered up to 600 mm (23 9/16 in). Site coverage: does not count under 1.8 m (5 ft 10 13/16 in).

In Edmonton a deck needs one at 1.2 m (47 3/16 in) or higher, or at any height in a front or flanking side yard.

Show me on a deck: Which permit this deck needs

Answers: Do I need a permit to build a deck?

Related terms: Site coverage, Deck height, Authority having jurisdiction

Read more: Uncovered Deck Design Guide, page 3 (City of Edmonton, PDF), Deck (Uncovered) permits (City of Edmonton)

Engineer stamp

A professional engineer's seal on a design, needed once a deck leaves the prescriptive tables.

Engineer stamp drawing. Engineer stamps the foundation. Engineer stamp: foundation. Area: 192 sq ft. Building permit: required, over 600 mm (23 9/16 in).

In Edmonton: the foundation above 1.8 m (5 ft 10 13/16 in), or over 55 square metres (592 square feet) on a deck that needs a permit; the whole deck above 3.6 m (11 ft 9 11/16 in) or under a heavy load.

Show me on a deck: When an engineer must stamp it

Lessons: Pier, pier block or screw pile, A hot tub on the deck, A roof over the deck, A second storey deck

Answers: How high can a deck go before it needs an engineer?

Related terms: Prescriptive, Extraordinary load, Screw pile, Authority having jurisdiction

Read more: Uncovered Deck Design Guide, page 5 (City of Edmonton, PDF), Uncovered Deck Design Guide, page 6 (City of Edmonton, PDF), Deck (Uncovered) permits (City of Edmonton)

Extraordinary load

A load beyond people, furniture and snow, like a hot tub, roof, fireplace or gazebo; it needs an engineered design.

Extraordinary load drawing. Past the span tables: engineered design. Extraordinary loads on the deck: hot tub. Engineer stamp: whole deck and every connection. Tub on its own pad: not used.

Show me on a deck: A hot tub on the deck

Lessons: When an engineer must stamp it, Tub on the ground, deck around, Power and heat for a tub, A roof over the deck, Barbecue islands and fireplaces, How old is this deck, Plan the hot tub circuit

Answers: How high can a deck go before it needs an engineer?

Related terms: Engineer stamp, Prescriptive, Knee brace

Read more: Uncovered Deck Design Guide, page 4 (City of Edmonton, PDF), Uncovered Deck Design Guide, page 12 (City of Edmonton, PDF), Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 26 (BC Housing, PDF)

Flashing

A formed strip of metal or membrane lapped over the ledger so water runs out, not behind it.

Flashing drawing. No flashing over the ledger. Flashing: none. Ledger fastened with: lag screws.

Show me on a deck: Flashing over the ledger

Lessons: Metals that corrode each other, How a ledger fails, What to check each spring

Answers: Should the deck be attached to the house or freestanding?

Related terms: Ledger, Galvanic corrosion, Rim board, Joist tape

Read more: Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 22 (BC Housing, PDF), Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 21 (BC Housing, PDF), DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 13 (American Wood Council, a US code guide not in force in Canada, PDF), Uncovered Deck Design Guide, page 2 (City of Edmonton, PDF)

Footing

The concrete pad or pile that spreads a post's load into the ground, below the frost line unless the code lets it stay above.

Footing drawing. Footing below the typical frost line. Footing depth: 4 ft. Frost line, typical in Edmonton: 1.2 m (47 3/16 in). Foundation: concrete pier on a pad.

The code lets a footing stay above the frost line on rock, on coarse-grained soil that drains well, or under a deck of not more than 55 square metres (592 square feet) with its joists within 600 mm (23 9/16 in) of the ground. Anywhere else it goes below frost, about 1.2 m (47 3/16 in) in Edmonton, or is designed.

Show me on a deck: Footings below the frost line

Lessons: Locate buried lines before digging, Bear on undisturbed soil, Set the post off the concrete, Build order and inspections, Inspect from the ground up

Answers: How deep do deck footings have to go?

Related terms: Frost line, Frost heave, Undisturbed soil, Pier block, Post

Read more: Uncovered Deck Design Guide, page 7 (City of Edmonton, PDF), Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 11 (BC Housing, PDF)

Freestanding deck

Also called floating deck.

A deck carried on its own posts at both edges, with no ledger on the house.

Freestanding deck drawing. Carried on its own posts at both edges. At the house: its own beam and posts. House side footing, as drawn, bears on: undisturbed soil. Width of the backfill in this drawing: a drawing convention, not a measured or code value. Flashing: no ledger.

Show me on a deck: Ledger or freestanding

Lessons: Single span or two span beam, Bracing a freestanding deck

Answers: Should the deck be attached to the house or freestanding?

Related terms: Ledger, Knee brace, Beam, Undisturbed soil

Read more: Uncovered Deck Design Guide, page 11 (City of Edmonton, PDF), Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 14 (BC Housing, PDF), DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 17 (American Wood Council, a US code guide not in force in Canada, PDF)

Frost line

The depth the ground freezes to; footings go below it, at least 1.2 m (47 3/16 in) as a rule in Edmonton, unless the code lets them stay above.

Frost line drawing. Footing above the typical frost line. Frost line, typical in Edmonton: 1.2 m (47 3/16 in). Footing depth: 36 in.

The code lets footings stay above it on rock, on coarse-grained soil that drains well, or under a deck of not more than 55 square metres (592 square feet) with its joists within 600 mm (23 9/16 in) of the ground. Anywhere else they go below it or are designed. The depth depends on the soil, so confirm the one your authority uses.

Show me on a deck: Footings below the frost line

Answers: How deep do deck footings have to go?

Related terms: Frost heave, Footing, Undisturbed soil

Read more: Uncovered Deck Design Guide, page 7 (City of Edmonton, PDF)

Galvanic corrosion

A metal eaten away where it touches a different metal, or modern treated wood, while wet.

Galvanic corrosion drawing. Aluminum on treated wood. Flashing: aluminum. Touching: modern treated lumber. Time outdoors: much later, not to a timescale. Condition: badly corroded.

Show me on a deck: Metals that corrode each other

Answers: Which parts of a deck have to be treated or naturally decay resistant?

Related terms: Flashing, Corrosion resistant fastener, Joist hanger

Read more: DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 3 (American Wood Council, a US code guide not in force in Canada, PDF), Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 28 (BC Housing, PDF)

Ground contact

The heavier treatment level for wood that touches the soil, such as a buried post.

Ground contact drawing. Ground contact treatment. Touches the soil: yes. Use category: ground contact. Closer than 6 in to the ground: yes, must be treated, cut ends too.

Show me on a deck: The 6 in treatment zone

Lessons: Treat every cut end, Which wood goes where

Answers: Which parts of a deck have to be treated or naturally decay resistant?

Related terms: Above ground, Post base, Incised

Read more: DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 2 (American Wood Council, a US code guide not in force in Canada, PDF), Uncovered Deck Design Guide, page 8 (City of Edmonton, PDF), Wood Preservation Canada (Canadian industry association)

Guard

Also called railing.

The barrier along an edge that stops a fall; required above 600 mm (23 9/16 in), and not the same as a handrail.

Guard drawing. Missing a required guard. Deck height: 30 in. Guard: required above 600 mm (23 9/16 in). Height needed: at least 900 mm (35 7/16 in). This guard: none.

At least 900 mm (35 7/16 in) high while the deck is under 1.8 m (5 ft 10 13/16 in), then 1.07 m (42 in) all the way round.

Show me on a deck: When a guard is required

Lessons: Measure height at the worst corner, 900 mm (35 7/16 in) or 1.07 m (42 in), What counts as the ground, Nothing to climb above 4.2 m (13 ft 9 5/16 in), Can a bench be the guard, Glass, cable and aluminum guards, When a stair needs a landing, A guard on a low deck, Wrapping around a corner, Two levels, one deck, A second storey deck, The final inspection checklist

Answers: How high does a deck railing have to be, and when do I need one?

Related terms: Baluster, Handrail, Climbable, Guard post, Deck height

Read more: Uncovered Deck Design Guide, page 14 (City of Edmonton, PDF), National Building Code of Canada 2020 (National Research Council, the model code), Uncovered Deck Final Building Inspection checklist (City of Edmonton, PDF)

Guard post

The post that holds a guard up, bolted to the rim with blocking behind, never notched and nailed.

Guard post drawing. A notched post held by nails. Fastened with: nails through a notch. Blocking behind: no. Rim and joists: 2 by 8 or deeper, as the span guide and Edmonton recommend.

Show me on a deck: Guard posts carry the push

Lessons: A 2x8 rim for guard posts, What blocking is for, What to check each spring, Wrapping around a corner, Outlets on the deck

Answers: How high does a deck railing have to be, and when do I need one?

Related terms: Rim board, Blocking, Lag screw, Through bolt

Read more: Uncovered Deck Design Guide, page 15 (City of Edmonton, PDF), Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 16 (BC Housing, PDF), DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 19 (American Wood Council, a US code guide not in force in Canada, PDF), Deck Evaluation Guide (North American Deck and Railing Association)

Heartwood

The darker inner wood of a log; in cedar it is the part that resists decay.

Heartwood drawing. All heartwood. Sapwood in this board: 0 percent. Heartwood: resists decay in cedar. Sapwood: little decay resistance, even in cedar. Time near the ground: much later, not to a timescale.

Show me on a deck: Cedar heartwood and sapwood

Lessons: Which wood goes where

Answers: Which parts of a deck have to be treated or naturally decay resistant?

Related terms: Sapwood, Ground contact, Above ground

Read more: Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 27 (BC Housing, PDF), DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 3 (American Wood Council, a US code guide not in force in Canada, PDF)

Incised

Treated lumber with rows of small cuts that let preservative in; it spans a little less than plain lumber.

Incised drawing. Over the table by 7 in. Allowed for a 2 by 8 Spruce Pine Fir, incised, at 16 in: 11 ft 5 in. Not incised: 12 ft. Incised: 11 ft 5 in. This span: 12 ft.

A spruce pine fir 2x8 at 16 in spans 12 ft plain and 11 ft 5 in incised.

Show me on a deck: Incised lumber spans less

Lessons: Treat every cut end

Answers: How far can a deck joist span?

Related terms: Span, S-P-F, Ground contact

Read more: Prescriptive Residential Exterior Wood Deck Span Guide, page 8 (Canadian Wood Council, PDF), Prescriptive Residential Exterior Wood Deck Span Guide, page 4 (Canadian Wood Council, PDF), Uncovered Deck Design Guide, page 11 (City of Edmonton, PDF)

Joist

The repeating framing member that carries the decking, no more than 600 mm (23 9/16 in) apart and usually 16 in.

Joist drawing. Joists over their span. Joists: 13, 16 in apart. Allowed span for a 2 by 8 Spruce Pine Fir at 16 in: 12 ft. Joist span, ledger to beam: 13 ft.

Show me on a deck: Deeper joists span farther

Lessons: Closer joists buy span, Where a joist cannot be cut, How far joists may overhang, Board thickness sets joist spacing, Diagonal boards pull joists closer, Gaps let the water through, Where board ends meet, Room for air underneath, Tape on the joist tops

Answers: How far can a deck joist span?

Related terms: Span, Blocking, Rim board, Joist hanger, S-P-F

Read more: Prescriptive Residential Exterior Wood Deck Span Guide, page 7 (Canadian Wood Council, PDF), Uncovered Deck Design Guide, page 11 (City of Edmonton, PDF)

Joist hanger

A metal bracket that carries a joist off a beam or ledger, only as strong as the fasteners its maker names.

Joist hanger drawing. Not the fasteners the hanger maker names. Fasteners: deck screws. Coating: hot dipped galvanized.

Show me on a deck: Hangers need their own fasteners

Lessons: Drop beam or flush beam, Rust where metal meets treatment

Answers: What size beam and post does my deck need?

Related terms: Flush beam, Corrosion resistant fastener, Ledger

Read more: Uncovered Deck Final Building Inspection checklist (City of Edmonton, PDF), Uncovered Deck Design Guide, page 9 (City of Edmonton, PDF), DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 9 (American Wood Council, a US code guide not in force in Canada, PDF), Deck Connection and Fastening Guide (Simpson Strong-Tie, a manufacturer guide)

Knee brace

A diagonal brace from a post up into the beam or frame that stops the deck racking sideways.

Knee brace drawing. Braced one way only: a design question. Ground to the joist underside: 6 ft. Column bracing: a design question over 600 mm (23 9/16 in). Braces: along the beam only. Engineered bracing: needed only over 3.6 m (11 ft 9 11/16 in).

No column bracing is required while the joist bottoms stay within 600 mm (23 9/16 in) of the ground. Above that it is a design question, and diagonal braces from the corner posts into the frame are usually adequate. Above 3.6 m (11 ft 9 11/16 in) the bracing is engineered.

Show me on a deck: Brace the corner posts

Lessons: Tall decks sway, Bracing a freestanding deck

Answers: How high can a deck go before it needs an engineer?

Related terms: Lateral load connection, Post, Freestanding deck

Read more: Uncovered Deck Design Guide, page 8 (City of Edmonton, PDF), DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 10 (American Wood Council, a US code guide not in force in Canada, PDF)

Lag screw

A heavy screw with a hex head, turned in with a wrench; the usual fastener for ledgers and guard posts.

Lag screw drawing. Ledger on lag screws. Fasteners: 1/2 in lag screws with washers. Pattern: staggered top and bottom. From the top and bottom edges: at least 2 in. From the ends: at least 5 in. Basis: inspection practice; the National Building Code does not prescribe ledger fastening.

Show me on a deck: Bolting the ledger

Answers: Should the deck be attached to the house or freestanding?

Related terms: Through bolt, Ledger, Guard post

Read more: Inspecting a Deck, Illustrated (InterNACHI, inspection practice), DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 16 (American Wood Council, a US code guide not in force in Canada, PDF), Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 14 (BC Housing, PDF), Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 28 (BC Housing, PDF)

Landing

A level floor at the top or bottom of a flight, or where a stair turns; the deck and the ground count.

Landing drawing. Landing needs a guard. Flights: 2, landing 36 in up. Guard on the landing: missing. Risers: 10, each 7 1/4 in.

Show me on a deck: When a stair needs a landing

Lessons: Folding a ramp to fit the yard, The step down from the door, Ramps to an upper deck, Lighting every change of level

Answers: When does a deck stair need a landing?

Related terms: Flight, Guard, Ramp

Read more: Uncovered Deck Design Guide, page 13 (City of Edmonton, PDF), Uncovered Deck Design Guide, page 15 (City of Edmonton, PDF)

Lateral load connection

Hardware that ties the deck frame into the house floor so the deck cannot pull away.

Lateral load connection drawing. Only the ledger fasteners hold it. Lateral load connection: none. Ledger fastened with: lag screws.

Show me on a deck: Tying the deck to the house floor

Lessons: Tall decks sway

Answers: Should the deck be attached to the house or freestanding?

Related terms: Ledger, Knee brace, Freestanding deck

Read more: DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 17 (American Wood Council, a US code guide not in force in Canada, PDF), Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 14 (BC Housing, PDF), Deck Connection and Fastening Guide (Simpson Strong-Tie, a manufacturer guide)

Ledger

Also called ledger board.

The board bolted to the house that carries one edge of the deck; most collapses start here.

Ledger drawing. Ledger held on with nails. Ledger fastened with: nails. Flashing: lapped over the ledger. At the house: a ledger on the house rim.

Show me on a deck: Bolting the ledger

Lessons: Ledger or freestanding, Flashing over the ledger, How a ledger fails, Tying the deck to the house floor, What to check each spring, Inspect from the ground up

Answers: Should the deck be attached to the house or freestanding?

Related terms: Flashing, Lag screw, Through bolt, Rim board, Lateral load connection, Freestanding deck

Read more: Uncovered Deck Design Guide, page 10 (City of Edmonton, PDF), DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 13 (American Wood Council, a US code guide not in force in Canada, PDF), DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 15 (American Wood Council, a US code guide not in force in Canada, PDF), Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 22 (BC Housing, PDF), Inspecting a Deck, Illustrated (InterNACHI, inspection practice), Deck Evaluation Guide (North American Deck and Railing Association)

Picture frame border

Boards run around the deck edge with mitred corners, framing the field boards; it needs blocking under the border.

Picture frame border drawing. Board ends with nothing under them. Blocking: missing. Joists: 13, 16 in apart.

Show me on a deck: Blocking under a picture frame

Lessons: Waste by board pattern

Answers: What decking can I use and how far apart do the joists go?

Related terms: Herringbone, Blocking, Fascia

Read more: Uncovered Deck Design Guide, page 12 (City of Edmonton, PDF), DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 3 (American Wood Council, a US code guide not in force in Canada, PDF)

Pier block

A precast concrete block on a pad at grade that carries a post on a low deck.

Pier block drawing. On this soil, a way in to re-level is required. Accepted in Edmonton: yes, near the ground, with a way in to re-level required on this soil. Soil: clay or poorly drained. Pier block pad: about 24 in square, at least 4 in thick. Re-levelling: required: a 24 in by 24 in access way or removable decking.

Edmonton has found pier blocks on pads generally adequate near the ground on well drained, undisturbed or compacted coarse grained soil or rock, as long as you can reach the posts to re-level them. On any other soil a way in is required: a 24 in by 24 in access way where the joist bottoms are at least 24 in up, or removable decking.

Show me on a deck: Pier blocks need access to re-level

Lessons: Pier, pier block or screw pile

Answers: How deep do deck footings have to go?

Related terms: Access way, Footing, Screw pile, Frost heave

Read more: Uncovered Deck Design Guide, page 7 (City of Edmonton, PDF)

Ply

One board in a built up beam; a 2 ply 2x10 is two 2x10s fastened together.

Ply drawing. Joint in the wrong place. Beam: 2 ply of 2 by 6. Span used to pick the beam: 12 ft. Nailing the plies: 2 rows of 3 1/2 in nails, no more than 18 in apart. Joint in the plies: mid span.

Nailed with 2 rows of 3 1/2 in nails no more than 18 in apart. In a 2 ply beam on three posts, the one joint goes over the middle post.

Show me on a deck: Building up a beam

Lessons: 4x4 or 6x6 post, Post spacing against beam size, The beam sits on the post

Answers: What size beam and post does my deck need?

Related terms: Beam, Post, Blocking

Read more: Uncovered Deck Design Guide, page 10 (City of Edmonton, PDF), Prescriptive Residential Exterior Wood Deck Span Guide, page 6 (Canadian Wood Council, PDF)

Post

The upright member that carries the beam down to the footing: a 4x4 or a 6x6.

Post drawing. A 4 by 4 where a 6 by 6 is needed. Beam: 3 ply of 2 by 10. Span used to pick the beam: 12 ft. Post the rule calls for: 6 by 6. Post used: 4 by 4.

A 4x4 only under a 2 ply beam, not over 6 ft 6 in tall, on a deck not more than 1.8 m (5 ft 10 13/16 in) up. Otherwise a 6x6, up to 12 ft.

Show me on a deck: 4x4 or 6x6 post

Lessons: Set the post off the concrete, The beam sits on the post, A second storey deck

Answers: What size beam and post does my deck need?

Related terms: Post base, Beam, Footing, Knee brace

Read more: Uncovered Deck Design Guide, page 8 (City of Edmonton, PDF), Prescriptive Residential Exterior Wood Deck Span Guide, page 5 (Canadian Wood Council, PDF)

Post base

A metal bracket that holds a post off the concrete so its end grain can dry.

Post base drawing. Post cast into the concrete. Post sits: cast into the concrete. Pier above grade: at least 150 mm (6 in). End grain can dry: no. Time outdoors: much later, not to a timescale.

The pier stands at least 150 mm (6 in) above grade. Never cast the post into it.

Show me on a deck: Set the post off the concrete

Answers: Which parts of a deck have to be treated or naturally decay resistant?

Related terms: Post, Footing, Ground contact

Read more: Uncovered Deck Design Guide, page 8 (City of Edmonton, PDF), Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 20 (BC Housing, PDF)

Prescriptive

Built straight from the span tables and standard details, with no engineer, as long as the deck stays inside them.

Prescriptive drawing. Over the table by 41 in. Longest in the tables at 16 in: 2 by 12, 17 ft 7 in. This span: 21 ft. Allowed for a 2 by 12 Spruce Pine Fir at 16 in: 17 ft 7 in.

Show me on a deck: Pier, pier block or screw pile

Lessons: Deeper joists span farther

Answers: How far can a deck joist span?

Related terms: Engineer stamp, Span, CCMC evaluation report, Authority having jurisdiction

Read more: Prescriptive Residential Exterior Wood Deck Span Guide, page 4 (Canadian Wood Council, PDF), Uncovered Deck Design Guide, page 5 (City of Edmonton, PDF)

Rim board

Also called rim joist, or band joist.

The joist that closes the ends of the frame; with side mounted guard posts, a 2x8 or deeper is recommended.

Rim board drawing. Rim shallower than the recommended 2 by 8. Rim joist: 2 by 6. Guard: required, at least 900 mm (35 7/16 in) high.

Show me on a deck: A 2x8 rim for guard posts

Lessons: Flashing over the ledger, How a ledger fails, What blocking is for, Guard posts carry the push, Squaring the frame

Answers: How high does a deck railing have to be, and when do I need one?

Related terms: Fascia, Guard post, Blocking, Joist

Read more: Uncovered Deck Design Guide, page 12 (City of Edmonton, PDF), Uncovered Deck Design Guide, page 14 (City of Edmonton, PDF), DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 19 (American Wood Council, a US code guide not in force in Canada, PDF)

Riser

The upright face of a step. Riser boards carrying the tread fronts let stringers go 1.2 m (47 3/16 in) apart, not 900 mm (35 7/16 in).

Riser drawing. Stringers too far apart. Riser boards: none, the risers are open. Stringer spacing: 2 stringers 42 in apart, allowed 900 mm (35 7/16 in) with open risers. Risers: 6, each 7 in.

Show me on a deck: The bottom riser trap

Lessons: Rise and run limits, Lighting the stair, The step down from the door, Lighting every change of level

Answers: How tall can a deck step be and how deep does the tread have to be?, How wide do deck stairs have to be and how far apart can stringers go?

Related terms: Rise, Tread, Stringer

Read more: Uncovered Deck Design Guide, page 13 (City of Edmonton, PDF)

Sapwood

The pale outer wood of a log; even in cedar it has little resistance to decay.

Sapwood drawing. The sapwood is rotting. Sapwood in this board: 70 percent. Sapwood: little decay resistance, even in cedar. Heartwood: resists decay in cedar. Time near the ground: much later, not to a timescale.

Show me on a deck: Cedar heartwood and sapwood

Answers: Which parts of a deck have to be treated or naturally decay resistant?

Related terms: Heartwood, Ground contact

Read more: Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 27 (BC Housing, PDF), DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 3 (American Wood Council, a US code guide not in force in Canada, PDF)

Span

The distance a member carries load between supports, measured from the middle of one support to the next.

Span drawing. Over the table by 12 in. Allowed for a 2 by 8 Spruce Pine Fir at 16 in: 12 ft. This span: 13 ft. Longest in the tables at 16 in: 2 by 12, 17 ft 7 in.

Show me on a deck: Deeper joists span farther

Lessons: Closer joists buy span, Incised lumber spans less, Species changes the span, Where a joist cannot be cut, Span plus cantilever picks the beam, Diagonal boards pull joists closer

Answers: How far can a deck joist span?

Related terms: Joist, Cantilever, Beam, Prescriptive

Read more: Prescriptive Residential Exterior Wood Deck Span Guide, page 7 (Canadian Wood Council, PDF), Uncovered Deck Design Guide, page 11 (City of Edmonton, PDF)

Stringer

The notched board that carries the treads of a stair, 1 1/2 in thick.

Stringer drawing. Stringers close enough. Stringer spacing: 2 stringers 4 ft apart, allowed 1.2 m (47 3/16 in) with riser boards. Stringer depth: 11 1/4 in, needs at least 235 mm (9 1/4 in). Throat: 5 3/8 in, needs at least 90 mm (3 1/2 in).

Stringers go up to 900 mm (35 7/16 in) apart, or 1.2 m (47 3/16 in) where riser boards support the front of the treads.

Show me on a deck: Stringer depth and spacing

Lessons: Gaps under rails and beside stairs, The bottom riser trap, Where the stringer meets ground, What to check each spring

Answers: How wide do deck stairs have to be and how far apart can stringers go?

Related terms: Throat, Tread, Flight, Rise

Read more: Uncovered Deck Design Guide, page 13 (City of Edmonton, PDF)

Through bolt

A bolt that passes right through the ledger and the house rim, held by a washer and nut on the far side.

Through bolt drawing. Ledger on through bolts. Fasteners: 1/2 in through bolts with washers. Pattern: staggered top and bottom. From the top and bottom edges: at least 2 in. Basis: inspection practice; the National Building Code does not prescribe ledger fastening.

Show me on a deck: Bolting the ledger

Answers: Should the deck be attached to the house or freestanding?

Related terms: Lag screw, Ledger, Guard post

Read more: Inspecting a Deck, Illustrated (InterNACHI, inspection practice), DCA 6, Prescriptive Residential Wood Deck Construction Guide, page 16 (American Wood Council, a US code guide not in force in Canada, PDF), Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 14 (BC Housing, PDF)

Undisturbed soil

Ground that has never been dug, below and beyond the loose backfill around a basement.

Undisturbed soil drawing. May be bearing on backfill. House side footing, as drawn, bears on: the backfill. Footing depth: 4 ft. Width of the backfill in this drawing: a drawing convention, not a measured or code value.

How far the basement dig reached is different on every lot, so the fill in the drawing is a drawing convention, not a measured or code value. On a real lot, find where the dig ended and bear past it, or go deeper.

Show me on a deck: Bear on undisturbed soil

Answers: How deep do deck footings have to go?

Related terms: Footing, Frost line, Freestanding deck

Read more: Uncovered Deck Design Guide, page 7 (City of Edmonton, PDF), Illustrated Guide for Building Safe and Durable Wood Decks and Balconies, page 11 (BC Housing, PDF)